Home Tags Liebherr

Tag: Liebherr

Mexican crane contractor Levantek has taken delivery of its first Liebherr crane. The LTM 1160-5.2 all-terrain crane is now the company’s most powerful mobile crane. Rising demand from customers for greater hoisting capacities was the main factor behind the...
The Bielefeld branch of the Federal Agency for Technical Relief has hoisted a 46 tonne temporary prefabricated bridge over the River Erft using an LTM 1650-8.1. It will replace the bridge that was destroyed and washed away by the...
1 becomes 2 because of 3 – the Liebherr LTM 1110-5.1 mobile crane has become the LTM 1110-5.2 because it has three completely new features – the crane control system, the driver's cab and the gearbox. The Liebherr 110 tonne...
Autodienst Eineder has taken delivery of a new Liebherr LTM 1250-5.1 mobile crane. It will replace an older 220 tonne crane in the Bavarian company’s fleet. The performance and compact dimensions of the new 250 tonne crane and the...
In Austria, work is currently proceeding at full speed on the "Salzburg line", the country's most important electricity infrastructure project. The Salzburg line runs for a total length of 128 kilometres through the province of Salzburg in partly alpine...
The end of an era after 220 models built – production of one of Liebherr’s most successful crawler cranes is being discontinued. The last LR 1600/2, which was primarily designed and used for wind power jobs, will be delivered...
The Polish crane and heavy haulage contractor took delivery of the first LTM 1650-8.1 mobile crane from Liebherr in Poland. The new crane will upgrade the company’s fleet which consists of over thirty Liebherr cranes. “The LTM 1650-8.1 has a...
It is the end of an era, both for the general management of Liebherr-France SAS and for the entire Liebherr Group. Martin Schickel is retiring after more than 44 years with the company. He is handing over the reins...
Work is currently being carried out in Burgenland, Austria, on repowering an existing wind farm. Old, small wind turbines on the extensive fields on the border with Slovakia are being dismantled to make way for more modern systems. Felbermayr’s...
The ultra-modern and well-equipped Betomix 2.5 further expands the ready-mixed concrete services of Heidelberger Beton in Berlin. The mixing plant delivers up to 115 m³ output per hour with its proven DW 2.5 twin-shaft mixer. The automatic high-pressure cleaning...